Quality technology applying cutting-edge techniques

Patents and Apply New Technologies

PAB tunnel(Patent No. 10221907), GREENPOL Greening Works(Patent No. 0359315)

Apply Technology of Enhancing Quality Competitiveness

Basic Construction Method of PC Soundproof the walls, Guarantee of Fly Ash Concrete, and etc.

image
image
image
image

Quality technology applying cutting-edge techniques

Fence of Protecting Animals

By Installing fence of total 14,306 km, reducing wildlife traffic accidents and preventing secondary accidents using expressway

Setting river in environmental restoration

Considering the wild animal forms, construction method for V-forming rapids, megalithic construction method on stepping-stones, and single megalithic construction method in stream.

Stone Mattress

Maintenance of riparian environment function by protecting the river revetment and the growth development of aquatic plant

image
image
image

Quality technology applying cutting-edge techniques

Soundproof Facilities Design for Landscape

By installing colored-soundproof facilites, Improve surroundings and minimize noise damage of local residents

Piers designed to simbolize the cultural assets

Ensuring beautiful scenery reflected piers designed by shaping the cultural assets images

Natural topsoil restoration methods

Provide a beautiful scenery and pleasant surroundings by using a method of effective early sprouting and growth effect.

image
image
image

Hoiyadaegyo

image

As a long span bridge, Hoiyadaegyo was constructed by I.L.M. technique considering high altitude and difficulty in installation of supporting posts by farms and Hoiya river under the bridge which is the water supply of Ulsan.
I.L.M.(Incremental Launching Method) technique refers to a method adding segments as long as 1/2 or 1/3 of the total length by sliding them after producing at the casting yard installed at the end of one post. Especially, 3 times of pushing was applied in I.L.M. construction of Hoiyadaegyo. Considering that only 2 times of pushing has been attempted in domestic constructions, it will greatly influence domestic construction of long span bridges in the future.

Location Dongcheon-ri, Cheongnyang-myeon, Ulju-gun, Ulsan
Length To Ulsan : 1,020m (3 lanes)
To Busan : 1,030m (3 lanes)
Construction Method I.L.M(Incremental Launching Method)
Design Speed 100Km/Hr(62.5 Mile/Hr)

Munsu tunnel

image

Located from Yeonghae-ri of Cheongryang-myeon to Gulhwa-ri of Beomseo-eup, Ulju-gun, Ulsan, Munsu tunnel pennetrates the stream of Mt. Munsu (△600m) on its western side.
NATM technique was chosen for the stable, economic, and convenient construction of the tunnel. A separate tunnel management building is under operation for the effective management and the immediate measurement for accidents.

Location Mountain Munsu, Beomseo-eup, Ulju-gun, Ulsan
Length To Ulsan : 1,599m (3 lanes)
To Busan : 1,508m (3 lanes)
Construction Method NATM(New Austrian Tunnelling Method)
Design Speed 100Km/Hr(62.5 Mile/Hr)